RFQ Details
# | Description | Spec / Size | Qty | Unit |
---|---|---|---|---|
1 | Cable‑protection tile | PVC, green, 1000 × 240 × 6 mm, inscription: “CAUTION – INSTRUMENT CABLES BELOW” | 100 | EA |
2 | Underground warning tape | PE, yellow, 150 mm × 0.1 mm, roll 365 m, inscription: “CAUTION – ELECTRICAL CABLE BELOW” | 50 | Roll |
3 | Cable‑route marker sign | Concrete Type 3, straight arrow, text “LV CABLES BURIED UNDERGROUND” (per sketch) | 20 | EA |
- Delivery requirement: Full quantity within 2 weeks from PO (supplier may propose alternative lead time).
- Quotation deadline: 16 Apr 2025.
- Commercial notes:
• State OEM & country of origin for each item.
• Confirm full compliance or list deviations.
• Acceptable terms: CIF Abu Dhabi or Ex‑Works.
2. Sender Contact
- Name: Asim Dar
- Job Title: Sales Manager
- Company: Bari Oilfield Equipment & Trading LLC
- Location: Abu Dhabi, UAE
- E‑mail: — (use website contact)
- Phone / WhatsApp: +971 50 251 0344
- Website: www.baritrading.com
3. Sector
Electrical & Instrumentation – Cable Protection / Warning Systems
We, Bari Oilfield Equipment and Trading LLC Abu Dhabi, is serving Oil & Gas and EPC sectors in Middle East with best sourcing of product.
We have requirement for the following:-
TILE;CABLE PROTECTION;1000MM X 240MM X 6MM;PVC;GREEN;WITH INSCRIPTION”CAUTION-INSTRUMENT CABLES BELOW” | Qty 100 Each |
TAPE;UNDERGROUND WARNING;150MM X 0.1MM;POLYETHYLENE;YELLOW;365 M PERROLL,W/INSCRIPTION”CAUTION-ELECTRICAL CABLE BELOW” | Qty 50 Each |
SIGN;CABLE ROUTE,MARKER;STRAIGHT ARROW;CONCRETE;TYPE 3,’LV’ CABLESBURIED UNDERGROUND, SKETCH | Qty 20 Each |
Kindly submit your best quotation by 16-APR-2025.
- Tenderer to confirm that it understands that all Goods in full quantity must be delivered within prescribed time frame from execution of the Purchase Order
If Not, Tenderer must state the proposed delivery lead time. - Bidder shall specify the “OEM” (Original Equipment Manufacturer) & ” COO” (Country of Origin) information.
- Bidder to confirm fully compliance to the required specification, please mention clearly deviation in case applicable.
- Bidder can quote with Ex-Works as well.
- 2 weeks is anticipated Lead-time to delivery material after issuing Purchase Order, however bidder can advise best possible delivery time.