1. RFQ Details
- Description: Supply, fabrication, transportation and installation of a complete profile sheet shed at the Air Compressor, Stand Trolleys and Heavy Damage areas of Toyota Service Mega Body Complex – Ghala, Oman, PRMS No. 202611755. The shed will integrate with the existing steel structure and provide weather protection.
- Quantity / Unit: 1 Complete Job, comprising:
- 4″ dia GI vertical posts, 5.0 m high – 10 Nos
- 3″ dia GI roof rafters/trusses – 10 Nos
- 3″ dia GI pipe purlins – 275 RM
- 2″ dia GI bracing members/stiffeners – 90 RM
- L-type MS gusset plate connections – 10 Nos
- PPGI/GI profile roofing sheets – 319 m²
- Painting & corrosion protection – 365 RM
- Civil/concrete foundations – 10 Nos
- Technical Specs:
- Shed Area 1: Approx. 42.0 m × 5.80 m, from Air Compressor area to Stand Trolleys area; maximum height 5.0 m.
- Shed Area 2: Approx. 12.50 m × 5.80 m, Heavy Damage area; maximum height 5.0 m.
- Vertical supports: 4″ dia GI pipe, 5 m high, including base plates and anchoring.
- Rafters/trusses: 3″ dia GI pipe, spanning 5.80 m.
- Purlins: 3″ dia GI pipe.
- Bracing/stiffeners: 2″ dia GI pipe.
- Connections: L-type MS gusset plates, minimum 8 mm thick, plus high-tensile bolts, nuts, washers, anchor bolts, welding electrodes and accessories.
- Roofing: Approved PPGI/GI Profile Roofing Sheets, minimum 0.45 mm thickness.
- Roofing fixings: Self-drilling screws with EPDM washers.
- Include side/end laps, ridge flashing, edge flashing and weatherproof accessories; finished roof must be leak-proof.
- Corrosion protection: Clean fabricated steel, remove rust/oil/welding residue, apply anti-rust primer where galvanizing is damaged and two coats of approved enamel paint or equivalent protective coating.
- Foundations: Excavation and concrete foundations using minimum M20 concrete, including reinforcement where required, anchor bolts, base plates, grouting, curing, backfilling and floor reinstatement.
- Safety barricading: GI pipe posts with yellow/black safety markings.
- Contractor must submit Shop Drawings, Construction Programme and MAS for client approval before starting work.
- Completion period specified in SOW: 10 days including mobilization.
- Maintenance/Warranty period in SOW: 12 months from completion and handover.
- Contractor is responsible for transportation, accommodation and food for employees.
- Mandatory site visit: Actual site conditions may differ from the reference drawing.
- Delivery Terms: Complete Supply, Fabrication & Installation at Toyota Service Mega Body Complex, Ghala, Oman. Payment within 30 days after invoice submission, as per SBG norms.
- Deadline: Site Inspection: 31 August 2026 | Bid Closing: 03 September 2026
2. Sender Contact
- Name: Ahmed Maher
- Job Title: Purchase & Contracts Department
- Company: Saud Bahwan Group LLC
- Location: Ghala, Muscat, Sultanate of Oman
- E mail: A.maher@sbgoman.com
- Phone / WhatsApp: +968 9329 3824 / Tel: +968 2457 8577
Site Visit Contact: Mr. Asarudeen Sevarayan – +968 9174 2607
3. Sector
Construction – Structural Steel / Roofing & Industrial Shed Works
We invite you to submit your quotation for : Profile sheet shed at Air compressor , Stand trollies side and Heavy damage side at Toyota Service Meg body complex – Ghala as per scope of work attached
Site Inspection Deadline: 31.08.2026
Bid Closing Date: 03.09.2026 (After Site Inspection)
Kindly ensure that your quotation is submitted on or before the bid closing date.
For any clarification or to arrange a site visit, please contact:
Contact Person: Mr. Asarudeen Sevarayan , contact no 91742607
Contact Person: Mr. Asarudeen Sevarayan , contact no 91742607
We request you to provide your best competitive price at the earliest.
Please submit your quote mentioning
Terms and Conditions
- Unit price for each activities involved
- Brand and quantity of any material or items you may use for this work
- Food Accommodation and transportation – under your scope
- Delivery terms – Please mention
- Payment terms – within 30 days after invoice submission (SBG Norms)
- Warranty – Please mention