1. RFQ Details
- Description:
Supply, transport, and installation of gates for the CONST OF SQ NAVAL BASE MIRBAT – PACKAGE A (Marine Works) project. Works must comply with tender specifications, drawings, BOQ, and main contract conditions. Scope includes site visit, demolition/removal of existing elements (if any), and installation in accordance with naval base security and operational requirements. - Quantity / Unit:
Not specified (Gates — quantities to be confirmed from BOQ and drawings). - Technical Specs:
• Marine and military-grade gates suitable for naval base infrastructure.
• Installation within marine environment conditions (corrosion resistance, structural integrity).
• Compliance with building layouts, access control systems, and security requirements.
• Back-to-back conditions with main contract.
• Must consider project location coordinates and access constraints.
• Documents referenced include: Tender documents, Addendums, Drawings, BOQ, Site Plan, Specifications. - Delivery Terms: Not provided.
- Deadline: 22/12/2025
• Clarifications: ASAP
• Technical Proposal: ASAP
• Commercial Proposal: ASAP
• Quotation Validity: 90 days from bidder-specified date.
2. Sender Contact
- Name: Indika Padma Kumara
- Job Title: Estimation Department
- Company: Al Tasnim Enterprises LLC
- Location: Oman (Mirbat / Salalah region)
- E-mail: estimation@altasnim.com
- Phone / WhatsApp: 91209583
3. Sector
Marine Construction / Defense Infrastructure / Steel Fabrication
| Project Information | |||||||||||||||||||
| Tender No. | Q68-09-2025 | ||||||||||||||||||
| Tender Title | CONST OF SQ NAVAL BASE MIRBAT – PACKAGE A (MARINE WORKS) | ||||||||||||||||||
| Project Description | Marine infrastructure works and naval Buildings. The project represents a significant naval facility development that will serve multiple operational functions.
The project is structured into three main components:
Marine Works – Core harbor infrastructure including breakwaters, quay walls, ship maintenance facilities (like a dry dock and ship lift), and specialized berths.
Buildings – Facilities for operational, administrative, and support functions, such as control centers and workshops for carpentry, welding, and weapons maintenance.
Infrastructure – Supporting systems for base operations, including fuel, water, power, communications, and safety systems like firefighting. |
||||||||||||||||||
| Buildup Area (BUA) |
|
||||||||||||||||||
| Material / Services/ Sub Contract Required | PROPOSAL REQUEST FOR SUPPLY, THRANSPORT AND INSTALATION OF GATES | ||||||||||||||||||
| Contact Person & Email | Indika Padma Kumara, estimation@altasnim.com 91209583 | ||||||||||||||||||
| Quotation Details | |||||||||||||||||||
| Issue of RFP | |||||||||||||||||||
| Tender documents :
Tender Addendums |
|||||||||||||||||||
| Particular Document – | Attached
|
||||||||||||||||||
| Site Plan | Attached | ||||||||||||||||||
| Last date of seeking clarification | ASAP | ||||||||||||||||||
| Submission Date for Technical Proposal | ASAP | ||||||||||||||||||
| Submission Date for Commercial Proposal | ASAP | ||||||||||||||||||
| Information | |||||||||||||||||||
| Employer | Mirbat, Salalah | ||||||||||||||||||
| Contractor | AL TASNIM ENTERPRISES LLC | ||||||||||||||||||
| Sub-contractor | |||||||||||||||||||
| Contract Period | Overall, 1,825 Calendar days inclusive of a 60-day mobilization period | ||||||||||||||||||
| Contract Type | Clause 55: Fixed Price Lump Sum | ||||||||||||||||||
| Document Enclosed | BOQ | ||||||||||||||||||
| Drawings | |||||||||||||||||||
| Specification | |||||||||||||||||||
| Project Location | Sultan Qaboos Naval Base at Mirbat is a vital part of Royal Navy of Oman installation development program. The base will be located 80 km from the City of Salalah in the governorate of Dhofar, 11 km east of Mirbat
Table 2-2: New Permanent Control Points NO EASTING NORTHING ELEV. EGM 2008 DESC. 1 266234.255 1875659.295 13.469 GM-1 |
||||||||||||||||||
| We are preparing a BOQ for the above project and you are requested to submit your competitive quotation for the above referred portion of the works to be executed under a sub-contract with ourselves in accordance with the specifications, related drawings and other main contract documents and in compliance with the undermentioned conditions:-
Your quotation should be valid for 90 days from XXX We require your proposal to be in our office on or before ASAP Your offer must be solely based on the tender documents and should be free of any qualifications. Should you wish to submit an alternative offer, and then such offer must be additional to and completely separate from the unqualified quotation. The set of tender drawings, specifications and the Main Contract conditions are available for reference/inspection in our offices during working hours. Visit the site and ensure all the works to be demolished & removed, are identified and included within the tender sum. Conditions are back to back basis.
|
|||||||||||||||||||