-
1. RFQ Details
Description: Carry out fabrication works at Toyota Service & Car Wash, Wattayah, including fabrication and installation of additional angle iron supports for granite wash basin counters and replacement of the wastewater tank cover structure, as detailed in the attached Scope of Work.
Quantity / Unit:
- Additional Angle Iron Supports for Granite Wash Basin Counter – 5 Nos
- Replacement of Waste Water Tank Cover Structure – 1 Job
Technical Specs:
Scope Item 1 – Additional Angle Iron Supports (5 Nos):
- Supply, fabricate, and install MS angle iron supports (40 × 40 × 5 mm).
- Support size: 600 × 600 mm.
- Install beneath existing granite wash basin counters at intervals not exceeding 1 meter.
- Securely anchor supports to wall/floor structure.
- Apply:
- One coat anti-rust primer.
- Two coats enamel paint.
- Scope includes all materials, fasteners, labor, tools, and consumables.
Scope Item 2 – Waste Water Tank Cover Replacement (1 Job):
- Remove and dispose of existing corroded wastewater tank cover, frame, and supports.
- Opening size approximately 2.15 m × 2.15 m.
- Inspect and strengthen existing tank edges where required.
- Design, fabricate, and install a new heavy-duty structural steel frame.
- Divide opening into four independently operable covers.
- Covers to be fabricated using heavy-duty MS chequered plate with structural reinforcement.
- Include heavy-duty hinges, recessed lifting handles, and locking arrangements.
- Structure shall safely withstand vehicle loads without excessive deflection.
- Corrosion protection by:
- Hot-dip galvanizing, or
- Zinc-rich primer with epoxy finish.
- Finished level shall match surrounding floor.
- Carry out testing for operation, alignment, safety, and structural integrity before handover.
Commercial / Submission Requirements:
- Site inspection required before quotation.
- Submit:
- Terms & Conditions.
- Unit price for each activity.
- Brand and quantity of materials.
- Datasheets where applicable.
- Delivery terms.
- Warranty.
- Contractor’s scope includes:
- Food.
- Accommodation.
- Transportation.
- Payment Terms: 30 days after invoice submission (SBG Standard).
Delivery Terms: To Toyota Service & Car Wash, Wattayah, Oman.
Site Inspection Deadline: 29 July 2026
Bid Closing Date: 1 /8/2026 (after site inspection)
2. Sender Contact
Name: Ahmed Maher
Job Title: Purchase & Contracts Department
Company: Saud Bahwan Group LLC
Location: Sultanate of Oman
E mail: A.maher@sbgoman.com
Phone / WhatsApp:
- Office: +968 2457 8577
- Mobile / WhatsApp: +968 9329 3824
Site Inspection Contact:
- Name: Sreechand Vishnudas
- Phone: +968 9987 3848
3. Sector
Steel Fabrication – Structural Steel Works, Maintenance & Industrial Construction
Kindly ensure that your quotation is submitted on or before the bid closing date.For any clarification or to arrange a site visit, please contact:
Contact Person: Sreechand Vishnudas , contact no 99873848
We request you to provide your best competitive price at the earliest.Please submit your quote mentioningTerms and Conditions-
- Unit price for each activities involved
- Brand and quantity of any material or items you may use for this work
- Food Accommodation and transportation – under your scope
- Delivery terms – Please mention
- Payment terms – within 30 days after invoice submission (SBG Norms)
- Warranty – Please mention
- document